Investing in renewable energy projects not only provides an opportunity to create a positive environmental impact but also to achieve solid financial returns. At The Green Power of Brazil, we work with carefully selected initiatives, ensuring that each project presents realistic yield projections and detailed risk assessments.
Project Development Milestones
The Green Power of Brazil
Land Research and Contract
Conducted comprehensive research on the land required for the project, including property ownership, legal considerations, and all necessary contracts or agreements.
Connection Data Gathering
Basic Engineering Studies
Carried out preliminary engineering assessments, including site surveys, soil testing, and feasibility analyses to establish the technical viability of the project.
Preliminary Water Grant
Obtained necessary water-related grants and permits to ensure the project has legal access to the required water resources.
Topographic Studies
Conducted detailed topographic surveys to understand the terrain and landscape features of the project site, which have informed the design and construction process.
Preliminary Environmental Authorization
Obtained the necessary preliminary environmental approvals and permits to ensure the project's compliance with environmental regulations.
Suppression Authorization
Obtained authorization to remove native vegetation in the area needed for construction.
Environmental Authorization
Completed the full environmental authorization process, including impact assessments and all necessary mitigation measures to replenish and preserve the local fauna and flora.
Installation Approval and Construction
Projects ready to initiate construction phase upon securing investment;
Start of Operation
In 2 years the plant will be running and generating energy revenue.